地鐵圍擋的安裝要注意什么?
來(lái)源:http://m.dajiajie.cn/ 發(fā)布時(shí)間:2021-11-10
1、圍擋施工前需作樣板,得到甲方與設(shè)計(jì)方的同意后方可施工
1. Before the enclosure construction, a sample shall be made, and the construction can be carried out only with the consent of Party A and the designer
2、圍擋鋁板不得有歪斜、缺棱掉角的裂縫等缺陷,接縫應(yīng)密實(shí),縫寬一致;
2. The enclosure aluminum plate shall be free of defects such as skew, missing edges and corners, and the joints shall be dense and the joint width shall be the same;
3、圍擋配件應(yīng)由廠家生產(chǎn)并在現(xiàn)場(chǎng)指導(dǎo)拼裝,面層漆均為烤漆,表面平整、光滑、色澤飽滿,并形成荷葉效應(yīng),嚴(yán)禁現(xiàn)場(chǎng)噴漆;
3. The enclosure accessories shall be produced by the manufacturer and assembled on site under the guidance of the manufacturer. The surface paint is baking paint, with flat, smooth surface, full color and lotus leaf effect. On site painting is strictly prohibited;
4、基座除采用本冊(cè)圖紙預(yù)制構(gòu)件外,可根據(jù)現(xiàn)場(chǎng)實(shí)際情況采用MU10灰砂磚砌筑,但主立柱應(yīng)加長(zhǎng),且螺栓與地面應(yīng)連接可靠,螺栓伸入地面以下不小于450mm;
4. In addition to the prefabricated components in this volume of drawings, the base can be built with mu10 lime sand brick according to the actual situation on site, but the main column shall be lengthened, the bolt shall be reliably connected with the ground, and the bolt shall extend no less than 450mm below the ground;
5、所有鋼管或立柱兩端均應(yīng)封口處理;
5、所有鋼管或立柱兩端均應(yīng)封口處理;
5. Both ends of all steel pipes or columns shall be sealed;
6、圍擋背面應(yīng)設(shè)斜撐,當(dāng)現(xiàn)場(chǎng)無(wú)設(shè)斜撐條件時(shí)應(yīng)采取其他措施保證圍擋穩(wěn)定和;
6. Diagonal bracing shall be set at the back of the enclosure. When there is no diagonal bracing condition on site, other measures shall be taken to ensure the stability and safety of the enclosure;
7、未盡事宜應(yīng)嚴(yán)格按有關(guān)規(guī)定、規(guī)范執(zhí)行;
7. Matters not covered shall be implemented in strict accordance with relevant national regulations and specifications;
8、管理要求:
8. Management requirements:
⑴工地大門(mén)采用9m寬的
(1) the gate of the construction site is 9m wide
標(biāo)準(zhǔn)圍擋
Standard enclosure
6m寬的圍擋僅用于大門(mén)兩側(cè);
6m wide enclosure is only used on both sides of the gate;
⑵道路路口轉(zhuǎn)角處應(yīng)設(shè)置通透式圍擋,并向兩側(cè)各延伸3000mm,保證交通;
(2) transparent enclosure shall be set at the corner of Road intersection and extend 3000mm to both sides to ensure traffic safety;
⑶圍擋臨道路側(cè)應(yīng)設(shè)置道路導(dǎo)向標(biāo)志、反光警示標(biāo)等警示設(shè)施,保證交通;
(3) road guide signs, reflective warning signs and other warning facilities shall be set at the side of the enclosure near the road to ensure traffic safety;
⑷圍擋應(yīng)定期檢查、清洗,保證其牢固、完整、整潔
(4) the enclosure shall be inspected and cleaned regularly to ensure that it is firm, complete and tidy
⑸圍擋內(nèi)外側(cè)嚴(yán)禁依靠圍擋堆放建筑材料、渣土及其他物品;
(5) it is forbidden to stack building materials, muck and other articles on the inner and outer sides of the enclosure;